COMMERCIAL
- Some companies hire out wind turbines. Can I hire a LES6000? There are no plans at the moment to hire out LES wind turbines.
- Are grants available for the LES6000? Grants are available through the Rural Development Programme for up to 60% of a project’s cost.
- How quickly will the LES6000 pay for itself? Without taking into account RDP grants, in an average wind regime, with an annual energy demand of 6000 units, the LES6000 will pay for itself inside 8 years.
- What warranty is offered with the LES6000? A manufacturer’s 2 year warranty is provided as standard.
- What items are covered by the warranty? All of the system’s components are covered by the manufacturer’s warranty during the first 2 years of service.
- How can I calculate if the LES6000 will save me money? A prediction of the annual energy that the LES6000 is likely to generate from the installation site’s average wind speed can be made. This prediction is based upon measured performance data for the turbine and statistical distribution of the sites wind speed. This information can then be compared against your annual energy consumption.
- How long will it take for the LES6000 to pay for itself? The length of time that it takes for the LES6000 to pay for itself is dependent upon the installation site’s wind speed. Turbines on sites with higher average wind speeds will pay for themselves faster.
